That is why the software you bought never took hold. Titanio embeds a pair of engineers inside your company and calls the job done only when one critical workflow is running in production, with real people using it.
Book a field diagnostic callNone of this is a tooling gap. You already have too many tools.
The product was good. Training happened. Two weeks later the team was back in the spreadsheet, because the system asked for a way of working nobody adapted to the house.
Serious people came in, listened to everyone, delivered a correct diagnosis. The deck is in the drive. Execution stayed your problem.
They are good and they know the company. They also already had a job. The project moves in the gaps, and gaps are the first thing to disappear when the month gets tight.
Technology does not fail because it is bad.
It fails because nobody stays to make it work.
We measured this inside our own house. Where someone follows through, the tool becomes routine. Where nobody does, it becomes one more forgotten login. That is why Titanio stopped shipping access alone.
Tiago Arakilian, founding partner
A pair embeds in the company, gets real system access and watches the operation from the inside. Not an interview. Not a workshop. Field work.
The chosen workflow goes into production on the platform Titanio already operates. Running, with your own people using it in their real work.
The same pair stays on. They adjust what reality exposed, train the operators and bring the next workflow in.
Investment is defined after the diagnostic, because it depends on what we find inside. So is the calendar: a twenty person operation and a four hundred person operation do not fit the same schedule.
Hard rules are written as rules and verified outside the model. The model handles what carries nuance. Every decision reaches your screen with the arithmetic exposed, so your team can check it by hand before approving.
| RULE | STATUS | THE ARITHMETIC THAT PROVES IT |
|---|---|---|
| Dual source on critical items | PASS | 4 active suppliers |
| On time delivery above target | PASS | 87.32% against 75.00% minimum |
| No order without material | PASS | all components covered |
| Plant capacity | PASS | utilization at 61% |
| Shipping window | PASS | all lanes arrive within the week |
| Import tariff applied | REVIEW | 25% on the CN to KR lane |
What counts as being in production is written and signed at the end of the diagnostic, before we start: which workflow, who the real users are, and how many real runs count as running. No room for interpretation later.
Titanio can promise this because the platform already exists and already runs. A consultancy cannot, because it starts from zero at every client.
Forward deployed engineering is how Palantir and OpenAI take enterprises to production. Titanio runs that model at a scale a mid sized company can actually buy, and without the waiting list. The talent shortage that makes this role hard to fill in the United States is not our problem.
Not a prototype. A full operations panel running today with real companies, which you can test before signing and use as the base for the tool your business needs. Invoicing and day to day compliance are already solved inside it.
Titanio moved its own operation to AI eighteen months ago and shipped more than ten products in that window. What we propose for your company is what we already did to ours.
Time zones that overlap the United States and Europe, senior engineers on the keyboard, and a cost that makes no sense to pay in San Francisco. The person who understands the problem is the person who writes the code.
Saying this now saves everyone the meeting.
Which process eats the most of your team's time today? Answer below and we will set up a diagnostic call. No sales deck, no pre baked proposal.